Slope Stabilisation

Slope Stabilisation Contract carried out at Juas Reservoir, Guernsey, Channel Islands.

The work involved drilling over 100 Nr. 25mm diameter Dywidag Hollow Mai Bar Soil Nails between 8 to 10 metre penetration depths and grouting, 30 Nr. Rock Anchors and associated Geotextile Fabric, Mesh Reinforcement and Concrete Gunite over the entire surface.

 
Sheet Piled Cofferdam for Underground Basement Structure
 

Sheet Piled Cofferdam for Underground Basement Structure

Ground levelling

 
Slope Stabilisation

Reinforced Concrete Slab, Blockwork Retaining Walls and Associated Ducts carried out at Forest Road Reservoir

Repairs to Horseshoe Pool
at La Valette

Horseshoe Pool was originally built as an outdoor seawater pool purpose built for swimming in 1859 and is submerged twice a day at each high tide. Crocker Civil Engineering were commissioned to make the walkways and steps safe.

 
Repairs to Horseshoe Pool
at La Valette
Next Page