 |
 |
Slope
Stabilisation
Contract
carried
out at
Juas Reservoir,
Guernsey,
Channel
Islands.
The
work involved
drilling
over 100
Nr. 25mm
diameter
Dywidag
Hollow
Mai Bar
Soil Nails
between
8 to 10
metre penetration
depths
and grouting,
30 Nr.
Rock Anchors
and associated
Geotextile
Fabric,
Mesh Reinforcement
and Concrete
Gunite
over the
entire
surface. |
|
 |
| Sheet
Piled Cofferdam
for Underground
Basement Structure |
 |
Sheet
Piled Cofferdam
for Underground
Basement Structure
Ground
levelling |
 |
 |
 |
Reinforced
Concrete
Slab, Blockwork
Retaining
Walls and
Associated
Ducts carried
out at Forest
Road Reservoir |
|
 |
Repairs
to Horseshoe
Pool
at La Valette
Horseshoe
Pool was originally
built as an
outdoor seawater
pool purpose
built for swimming
in 1859 and
is submerged
twice a day
at each high
tide. Crocker
Civil Engineering
were commissioned
to make the
walkways and
steps safe. |
 |